Tavolata

Type: Tenant Improvement Project for the first build-out of Ethan Stowell’s Tavolata Franchise east of the Cascades

Location: Downtown Spokane, in the Historic Old City Hall Building

Scope of Work: The scope of work included the complete demolition of the existing Olive Garden restaurant that inhabited the space from 1990 through 2015 and reorganizing the space to incorporate the existing terrazzo, masonry and steel that was exposed following demolition.  Modern wood accents were incorporated for the ceilings, wall coverings, shelving and furniture to complement the existing materials.

Additional design considerations for the project included working with the National Park Service due to the building being listed on the National Historic Register.  The addition of a cook line and hood required routing ventilation from the main level of the building all the way to the roof of the existing six story building.